NASA’s Moon Base plan begins with scouting, not construction. A NASA STEM Team explainer, with Kaitlyn Adams credited as creator, describes a phased effort to prepare for longer stays on the lunar surface. The planned base is an outpost where astronauts could live, work and explore; the explainer presents it as a future goal, not an operating facility.

NASA places the proposed outpost in the lunar South Pole region, selected for its lighting conditions and potential for scientific discovery. The Sun stays low on the horizon there. Some areas may receive sunlight for extended periods, while other areas remain in shadow for long stretches. Sunlit locations could help generate solar power and support navigation. Permanently shadowed craters, meanwhile, are places where scientists hope to find frozen water. The source describes that water as a prospect to investigate, not a confirmed discovery.

The plan has three phases, each intended to build on what is learned. In the first, which the explainer says is underway, robotic missions are meant to explore the region, test technologies and help identify possible construction sites. NASA’s VIPER rover is described as fully built and undergoing tests, with a 2027 launch planned to explore permanently shadowed craters for water and other resources. The explainer also describes PROMISE, a nuclear-powered rover being built using existing Mars rover hardware, with a launch targeted for late 2028. These are stated plans and schedules; the report does not provide results from the missions.

Other planned machines would survey terrain and support later exploration. Lunar terrain vehicles are slated to reach the South Pole region by 2028, where astronauts could use them to cover more ground and gather geology samples; when crews are away, the vehicles are intended to be operated remotely from Earth. NASA’s MoonFall mission is described as a group of propulsive drones that would map hard-to-reach terrain and help identify potential Artemis landing sites. The explainer says they are expected to operate separately during a single lunar day, about 14 Earth days.

The next phase, planned for 2029–2032, would begin setting up infrastructure across multiple locations, including power, cargo transport and communications systems. In the third phase, NASA would assemble a permanent outpost with habitats, power and communications, and transportation. The explainer does not name a final construction site or describe a completed design. Its sequence makes robotic surveys and early infrastructure part of a gradual build-up rather than a single construction project.

The setting also explains why the preparation matters. In NASA’s account, temperatures can exceed 130°F (54°C) in sunlit areas and fall to -334°F (-203°C) inside permanently shadowed craters. Slopes, ridges, rocks and deep craters complicate travel and landing. The loose lunar surface material, called regolith, has sharp-edged particles because the Moon lacks wind and rain to wear them down. NASA says this dust can damage equipment and spacesuits, and must be kept out of living areas.

The same challenges make the region a testing ground for learning how people might live and work beyond Earth. NASA says experience with landing, construction and exploration technologies on the Moon could help prepare for human missions to Mars. That is the rationale in the explainer, not evidence that lunar systems are already proven for Mars. For now, the report’s central idea is that robotic exploration can help reveal where and how a sustained human presence might be possible.